Cornish Metals Inc. (TSX-V/AIM: CUSN) (“Cornish Metals” or the “Company”), is a dual-listed company focused on advancing the past producing South Crofty high-grade, underground tin project through a parallel mine dewatering programme, delivery of a Feasibility Study and exploring its additional mineral rights, all located in Cornwall, South West England.

Following the £40.5 million financing completed in May 2022, the Company is pleased to provide the following operations update on the South Crofty tin project. Photographs of some of the activities underway can be viewed here.

Richard Williams, CEO of Cornish Metals Inc, commented; “It is wonderful to see the level of activity underway at South Crofty, as we progress through the construction of the Water Treatment Plant, and undertake a metallurgical sample drill programme. We are now in an exciting period for the Company and our stakeholders. It is inspiring to see the pride and dedication that our team displays, knowing that they are contributing to the success of a project that means a lot to the local community and a restart of the Cornish tin industry.”

Water Treatment Plant Construction (WTP)

  • The WTP construction is on track for planned commissioning in June 2023.
  • Detailed design of the WTP is now 75% complete.
  • The current cost estimate for the WTP is between £6.5 to £7.0 million.
  • The foundation slab for the WTP has been designed, the shuttering and steel reinforcement complete and concrete pouring has commenced.
  • The treated water discharge duct from the WTP to Middle Engine Shaft is complete.
  • All key equipment suppliers have been engaged, contracts awarded and delivery dates assigned.
  • Six large steel clarifier tanks are being fabricated locally with delivery and installation expected to commence in December 2022.
  • Ongoing water treatment studies have further optimised the treatment process, resulting in a reduction in reagent consumption, an improvement to metal and suspended solids recovery, and an expected reduction in operating costs.

Mine Dewatering

  • The two submersible pumps purchased in 2018 have been checked and tested, both of which are in good working order.
  • Pump installation into New Cooks Kitchen (NCK) shaft is planned to commence this month, with both pumps expected to be installed to approximately 370 metres depth below surface by the end of February 2023.
  • Sections of the NCK shaft headframe have been removed to prepare for pump installation into the shaft.
  • Pump and pipe handling infrastructure has been installed and tested.
  • All steel pipes required for pumping have been delivered to site and ready for installation.
  • A new single drum winder has been ordered, for delivery in Q3 2023, to enable the NCK shaft re-accessing.

Metallurgical Drilling

  • Three diamond drill rigs are currently in use at North Pool Zone (drilling from surface into the eastern section of the South Crofty Mineral Resource), No. 4 and No. 8 Lodes (drilling from surface into the central section), and Roskear / Dolcoath areas (drilling from underground in the western decline into the western section).
  • Drilling to the North Pool Zone is nearing completion of the directional drilling phase, and sample collection for metallurgical testwork is expected this month.
  • Multiple wedged drillholes have successfully drilled into No. 4 and No. 8 Lodes, with intersects into No. 8 Lode being wider than anticipated, meaning less drilling will be required for sample collection from this mineralised structure. Visually, drillholes into both structures display good cassiterite (tin) mineralisation. At current rates, completion of the drilling into No. 4 and No. 8 Lodes is expected before year end.
  • The underground drill rig targeting the Roskear section of the Mineral Resource has completed the directional phase of drilling and samples are currently being collected for the metallurgical studies. Encouraging visible tin mineralisation has been encountered, in line with expectations for this area of the South Crofty Mineral Resource.

Feasibility Study (FS)

  • Initial work on the FS is underway, including hydrogeology, geotechnical studies, ventilation, shaft refurbishment, and initial groundwork investigations for the process plant foundations.
  • A metallurgical testwork programme has been developed, including ore sorting, process design confirmation and paste backfill.

Health and Safety

  • Zero lost time incidents to date.
  • A new Health and Safety Officer has been employed.
  • A new underground refuge chamber has been constructed and commissioned.
  • New self-contained Self-Rescuers have been purchased and commissioned.
  • The Company is undertaking comprehensive internal and external competency training programmes with all new and existing staff.
  • Two new mine rescue teams have been recruited, with training starting this month.
  • New ventilation ducting has been installed in the western decline in support of the underground drill progamme.
  • WiFi connections have been installed underground to provide improved communications with surface.

Community Engagement

  • The most recent Community Meeting was held on 8 September, 2022 at Heartlands World Heritage Mining Site.
  • The local community continues to be very supportive of plans to progress South Crofty towards production.  The full video of the meeting can be accessed here.
  • The Company continues to provide ongoing support and funding to local charities, sports teams and also to minerals industry related education by providing transport and entrance fees for local primary school trips to the Geevor Tin Mine museum.

Workforce

  • The Company has expanded its staff levels considerably since closing the May financing, and now has over thirty full-time employees on site, as well as numerous contractors.
  • Senior staff positions, including Project Manager, Senior Project Engineer, and Feasibility Study Manager, have been filled.

Local and National Content

  • The Company is extremely pleased to find that many services and skills required for the current work at South Crofty are available within Cornwall and UK.

A list of local and national suppliers to the South Crofty project can be found here